THE CONSTRUCTION OF ADAPAZARI - KARASU PORTS AND INDUSTRIAL PLANTS RAILWAY CONNECTION SUBSTRUCTURE
MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE OF THE REPUBLIC OF TURKEY
CONTRACT DATE: April 05, 2011
ACCEPTANCE DATE: December 17, 2018
This project, which is of great importance for freight transportation between the provinces of Adapazarı and the ports of Karasu, constitutes the 1st Phase of the Adapazarı-Bartın Railway Line. The upcoming Karasu Port will provide an alternative route for the distribution of goods transported by sea from the Black Sea to Anatolia.
Starting from Arifiye Station in the province of Adapazarı and ending at Karasu Port, passing through a highly challenging terrain, the project involves 9,000,000 m³ of earthwork, 12,680,000 m of various ground improvement systems, 400,000 m³ of reinforced concrete construction, 50,000 tons of construction steel, 1 viaduct with a length of 500 m, and 190 small and large artistic structures along the route.