CONSTRUCTION WORK OF (ERZURUM-AŞKALE) SECTION-İSPİR STATE HIGHWAY BROKEN TUNNEL (INCLUDING CONNECTION ROADS) KM:63+880-79+663,89 SECTION
GENERAL DIRECTORATE OF HIGHWAYS
CONTRACT DATE: 24.10.2014
ACCEPTANCE DATE: 17.09.2019
The project includes the construction of a 7.1 km long double tube tunnel between Erzurum and İspir. This tunnel shortens the distance between Erzurum and İspir by 40 km compared to the existing road.