top of page
MUŞ PLAIN PUMP IRRIGATION PART 1
GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS
CONTRACT DATE: April 28, 2023
The project area is within the borders of Muş Province. The project includes the installation of 406,000 meters of pipes, construction of an open channel with a length of 28,000 meters, establishment of 8 pump stations, and construction of a maintenance road with a length of 47,500 meters, all required for irrigating a gross 16,748 hectares of agricultural land.
![](https://static.wixstatic.com/media/1a5066_8e92808c19cd4d09903c77b74f5b1bf1~mv2.png/v1/fill/w_300,h_300,q_90/1a5066_8e92808c19cd4d09903c77b74f5b1bf1~mv2.png)
bottom of page