Completion Works of Çirişli Tunnel and Connection Roads

GENERAL DIRECTORATE OF HIGHWAYS

CONTRACT DATE: 17.02.2026

The project area is located on Çat-Karlıova Road. The project consists of 5,935 km HBM road construction and double tube tunnel with a length of 9.500,00 m. constructed with NATM method. 